Testing
Proving integrity before energisation.
What this covers
A complete testing regime — insulation resistance, primary and secondary injection, protection-relay verification and diagnostic measurements — confirms that every circuit and protective device performs exactly as designed before it is placed in service.
Discuss your projectDelivered as a coordinated package
Insulation resistance testing
Primary and secondary injection
Protection relay verification
Diagnostic and partial-discharge tests
The rest of our capability
Equipment Supply
Switchgear, transformers and protection equipment specified and procured to grid code.
Learn moreInstallation
HV and MV plant installed to standard by authorised, safety-assured engineers.
Learn moreCommissioning
End-to-end energisation and functional proving before controlled handover.
Learn moreMaintenance
Planned and reactive maintenance keeping assets compliant, safe and available.
Learn moreEngineering Design
Substation and network design, protection studies and complete documentation.
Learn more